TAMANDUATEÍ STATION | LINE 2 VERDE | METRO/SP

TAMANDUATEÍ STATION | LINE 2 VERDE | METRO/SP

BASIC AND DETAILED DESIGNS

Construtoras Constran S.A. e Norberto Odebrecht
Dec/2005 to May/2010

The Tamanduateí Station pertains to Line 2 – Verde of the São Paulo Metro (Subway). It is an elevated Metro Station (with a built area of 12,068.62 m2), which integrates with the regular Railway Station bearing the same name and pertaining to Line 10 – Turquesa of the CPTM, by means of a mezzanine, which is common to both stations. The station was built in concrete with a metal structure (covering), having ample areas enclosed by glass panes (mezzanine), in order to make best use of natural lighting.

This elevated concept arose from the need to transpose and integrate with the Railway (Line 10 – Turquesa of the CPTM). This allowed the structuring of the body of the station into four superposed levels (technical quarters, operational, mezzanine and platform). These levels were set up in different tiers, thus creating alternating volumes and transparencies

Elevad


Station

12,068.62 m²


built area

Integrates with


line 10 – Turquesa of CPTM

DESIGN

Basic Engineering Design

  • Architecture and Electrical Installations.

Pre-Detailed Design

  • Architecture, Engineering (civil works), Infrastructure for Installations (station and tracks).

Detailed Design

  • Engineering/civil works: Construction method, geotechnics, road systems, foundations, bracing, permanent drainage, structures of reinforced and pre-stressed concrete, metal structures, leakage current and waterproofing;
  • Architecture/finishing (including lighting and acoustics technologies), visual communications, landscaping and urbanization;
  • Detailed Design of hydraulic installations and firefighting (station and tracks).

TECHNICAL SUPPORT AND ADVISORY SERVICES FOR THE WORKS

In continuity to this contract, Setec Hidrobrasileira provided technical follow up for the works, which has been contracted with the ‘Construtora Norberto Odebrecht’ .

fechar